BRIDGE REHABILITATION
Idanha Bridge Repair
This project required a work platform to be installed so we could perform horizontal bridge strengthening. Once completed the deck was replaced eliminating the load rating on the structure.
Champoeg Rd Headwall Repair
A head wall on Champoeg road was failing. To repair this issue BENT LLC dug out and exposed the existing head wall, drilled anchors and poured dead men, pulled the wall back into place, braced it off, sealed the fracture, back filled, placed roadway agg. and paved.
Willamina Rail and Bridge Deck Repair
A truck had damaged the rail and bridge deck. BENT LLC built a work platform, removed sections of the sidewalk, bridge deck and rail. We then replaced these pieces and put a new steel rail on top matching the existing. Challenges included getting access to the work and working over a live river.